# ASIC Upgrade Daily Contribution Change — Ordered Trend Analysis

> ASIC Upgrade Daily Contribution Change — Ordered Trend Analysis is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-20).

Analyzes ordered trends in daily net contribution changes from an ASIC miner upgrade across a time series of energy savings, extra revenue, and extra overhead rows.

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-mining-upgrade-benefit-trend?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-20
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/asic-upgrade-daily-contribution-change-ordered-trend-analysis-d5daf64b
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_V9K8xEW3okEDYcPNcyih5

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability asic-upgrade-daily-contribution-change-ordered-trend-analysis-d5daf64b -d '<json body>'
```

Example prompt: I want to see an ordered trend analysis of how my ASIC upgrade is paying off day by day — here are four days of data: day 1 saved $2 energy, $3 extra revenue, $1 extra overhead; day 2 saved $2.20, $3.30 revenue, $1.10 overhead; day 3 saved $2, $3, $1; day 4 saved $2.20, $3.30, $1.10. Can you run the contribution change trend report?

## When to prefer this

Choose this endpoint when you need an ordered (sequence-aware) trend analysis of daily net contribution changes from an ASIC hardware upgrade, given a time series of per-day energy savings, extra revenue, and extra overhead. It is distinct from single-calculation or batch-average endpoints because it preserves row order to reveal directional trends. Prefer it over generic financial trend APIs when your data is specifically structured around ASIC mining upgrade contribution decomposition.

## Known failure modes

- Fewer than 2 rows supplied — minimum of 2 rows required
- More than 200 rows supplied — exceeds maxItems limit
- extra_overhead_usd is negative — must be 0 or above
- Any required field (extra_revenue_usd, saved_energy_usd, extra_overhead_usd) missing from a row — schema validation error
- Values exceeding maximum bounds (1e16 for revenue/energy, 1e16 for overhead) — rejected
- Payment of 0.01 USDC not received — 402 Payment Required response

## How this service works

ASIC upgrade daily contribution change — Ordered trend analysis: Ordered trend analysis for ASIC upgrade daily contribution change. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded ordered trend analysis report.

## Output

Returns a bounded ordered trend analysis report covering the sequence of daily net contribution changes derived from the supplied ASIC upgrade parameters (extra revenue, saved energy, extra overhead). The report uses the disclosed formula and units to show how daily contribution is trending across the input rows. No live prices or guaranteed return projections are included.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "rows": {
   "type": "array",
   "items": {
    "type": "object",
    "required": [
     "extra_revenue_usd",
     "saved_energy_usd",
     "extra_overhead_usd"
    ],
    "properties": {
     "saved_energy_usd": {
      "type": "number",
      "default": 2,
      "maximum": 10000000000000000,
      "minimum": -1000000000000
     },
     "extra_revenue_usd": {
      "type": "number",
      "default": 3,
      "maximum": 10000000000000000,
      "minimum": -1000000000000
     },
     "extra_overhead_usd": {
      "type": "number",
      "default": 1,
      "maximum": 10000000000000000,
      "minimum": 0
     }
    },
    "additionalProperties": false
   },
   "default": [
    {
     "saved_energy_usd": 2,
     "extra_revenue_usd": 3,
     "extra_overhead_usd": 1
    },
    {
     "saved_energy_usd": 2.2,
     "extra_revenue_usd": 3.3000000000000003,
     "extra_overhead_usd": 1.1
    },
    {
     "saved_energy_usd": 2,
     "extra_revenue_usd": 3,
     "extra_overhead_usd": 1
    },
    {
     "saved_energy_usd": 2.2,
     "extra_revenue_usd": 3.3000000000000003,
     "extra_overhead_usd": 1.1
    }
   ],
   "maxItems": 200,
   "minItems": 2
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/asic-upgrade-daily-contribution-change-ordered-trend-analysis-d5daf64b/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
