# BuildPulse Construction Schedule API

> BuildPulse Construction Schedule API is a paid API for AI agents from buildpulse.theaslangroupllc.com, paid per call via x402, $0.1/call, status unknown (last checked 2026-09-14).

Returns trade sequencing, inspection milestones, and the critical path for a construction build project

## Facts

- Endpoint: GET https://buildpulse.theaslangroupllc.com/api/build/schedule
- Price: $0.1/call
- Payment: x402
- Status: unknown
- Last checked: 2026-09-14
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/buildpulse-construction-schedule-api-62aa261b
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_OuHdhVyq9z0somIZ8_f2Y

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability buildpulse-construction-schedule-api-62aa261b
```

Example prompt: Can you pull the construction schedule for a residential ground-up new build — I need the trade sequencing, inspection milestones, and critical path so my GC can coordinate subcontractors starting in March?

## When to prefer this

Use this endpoint when a contractor, GC agent, or homeowner needs a structured construction schedule with trade sequencing and inspection milestones for a specific build. Prefer this over generic project management tools when the use case is specifically construction-domain scheduling with critical path analysis and trade coordination.

## Known failure modes

- Missing or unrecognized project type returns an error or empty schedule
- Unsupported build scope may return a partial or generic schedule
- Invalid or missing parameters may return a 400 bad request
- Ambiguous project description may yield a generic rather than tailored schedule
- Network or service outage returns 5xx error

## How this service works

Construction schedule for contractor and GC agents. Returns trade sequencing, inspection milestones, and the critical path for any build.

## Output

A structured construction schedule including ordered trade sequencing (e.g. demo, framing, MEP rough-ins, insulation, drywall), key inspection milestones with timing, and the critical path showing task dependencies and schedule-driving activities for the specified build.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "lang": {
   "type": "string",
   "description": "lang"
  },
  "start": {
   "type": "string",
   "description": "start"
  },
  "project": {
   "type": "string",
   "description": "project"
  }
 }
}
```

## Response schema (JSON Schema)

```json
{
 "type": "json",
 "example": {}
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/buildpulse-construction-schedule-api-62aa261b/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from buildpulse.theaslangroupllc.com](https://www.zero.xyz/host/buildpulse.theaslangroupllc.com/llms.txt)
