# BuildPulse Construction Schedule API

> BuildPulse Construction Schedule API is a paid API for AI agents from buildpulse-alpha.vercel.app, paid per call via x402, $0.1/call, status unknown (last checked 2026-09-15).

Returns a trade-sequenced construction schedule with inspection milestones and critical path analysis for a given build project.

## Facts

- Endpoint: GET https://buildpulse-alpha.vercel.app/api/build/schedule
- Price: $0.1/call
- Payment: x402
- Status: unknown
- Last checked: 2026-09-15
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/buildpulse-construction-schedule-api-cb34dc8a
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_Z6G50-4rK5-EYVphkGbHU

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability buildpulse-construction-schedule-api-cb34dc8a
```

Example prompt: Can you pull a full construction schedule for a 1,200 sq ft bathroom and kitchen remodel in Denver, CO — I need the trade sequencing, all the inspection milestones, and the critical path so I know what can't slip?

## When to prefer this

Use this endpoint when a contractor, GC, or homeowner agent needs a structured, sequenced build schedule with inspection checkpoints and critical path clarity — particularly when coordinating multiple subcontractors and needing to understand task dependencies. Prefer this over generic project management tools when the output needs to be construction-domain-specific with trade-level granularity.

## Known failure modes

- Missing or ambiguous project type returns a generic or error response
- Unsupported project scope or region may yield incomplete trade sequences
- Network timeout if the generation model is under load
- 402 Payment Required if the x402 payment header is not included or insufficient

## How this service works

BuildPulse — home construction and renovation intelligence: project cost estimates, contractor vetting, permit requirements, material pricing, ROI projections, and inspection checklists. Global coverage — jurisdiction-aware permits, codes, and costs (US and Canada deepest; UK/AU equivalents handled).

## Output

A structured construction schedule including ordered trade sequencing (e.g. demo → framing → MEP rough-in → inspections → drywall → finishes), identified critical path tasks that cannot be delayed without affecting the overall timeline, and specific inspection milestones required at key phases of the build.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "lang": {
   "type": "string",
   "description": "lang"
  },
  "start": {
   "type": "string",
   "description": "start"
  },
  "project": {
   "type": "string",
   "description": "project"
  }
 }
}
```

## Response schema (JSON Schema)

```json
{
 "type": "json",
 "example": {}
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/buildpulse-construction-schedule-api-cb34dc8a/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from buildpulse-alpha.vercel.app](https://www.zero.xyz/host/buildpulse-alpha.vercel.app/llms.txt)
