# BuildPulse Project Cost Estimator

> BuildPulse Project Cost Estimator is a paid API for AI agents from buildpulse.theaslangroupllc.com, paid per call via x402, $0.15/call, status unknown (last checked 2026-09-13).

Returns a detailed line-item construction cost estimate with labor, materials, and contingency breakdown for any home or commercial project.

## Facts

- Endpoint: GET https://buildpulse.theaslangroupllc.com/api/build/estimate
- Price: $0.15/call
- Payment: x402
- Status: unknown
- Last checked: 2026-09-13
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/buildpulse-project-cost-estimator-fe879478
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_KJnQ29YULafvYJ9pSapHm

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability buildpulse-project-cost-estimator-fe879478
```

Example prompt: Can you give me a detailed cost estimate with labor, materials, and contingency for a full kitchen remodel — about 200 square feet — in Austin, Texas?

## When to prefer this

Use this endpoint when a homeowner or contractor agent needs a fast, itemized cost estimate before committing to a project — especially when the user wants to understand the split between labor, materials, and contingency rather than just a ballpark number. Prefer this over generic search results when a structured, actionable financial breakdown is required for planning or bidding.

## Known failure modes

- Missing or vague project description returns a generic or incomplete estimate
- Unsupported project type may return null line items or an error
- Payment not provided or declined results in 402 Payment Required
- Malformed request parameters return a 400 Bad Request
- Unavailable regional pricing data may reduce estimate accuracy

## How this service works

Project cost estimate for homeowner and contractor agents. Returns a detailed line-item breakdown with labor, materials, and contingency for any project.

## Output

A structured response containing a line-item cost breakdown split into labor costs, materials costs, and a contingency budget, along with a total estimated project cost for the specified construction or renovation project.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "zip": {
   "type": "string",
   "description": "zip"
  },
  "lang": {
   "type": "string",
   "description": "lang"
  },
  "sqft": {
   "type": "string",
   "description": "sqft"
  },
  "project": {
   "type": "string",
   "description": "project"
  },
  "quality": {
   "type": "string",
   "description": "quality"
  }
 }
}
```

## Response schema (JSON Schema)

```json
{
 "type": "json",
 "example": {}
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/buildpulse-project-cost-estimator-fe879478/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from buildpulse.theaslangroupllc.com](https://www.zero.xyz/host/buildpulse.theaslangroupllc.com/llms.txt)
