# Electric Grid Reliability & Interconnection Compliance Brief

> Electric Grid Reliability & Interconnection Compliance Brief is a paid API for AI agents from oracles-production.up.railway.app, paid per call via x402, $0.25/call, status unknown (last checked 2026-09-15).

Returns an LLM-generated digest of the most important electric-grid reliability and interconnection regulatory rules and deadlines within a specified time window.

## Facts

- Endpoint: GET https://oracles-production.up.railway.app/v1/reg-grid-reliability/brief
- Price: $0.25/call
- Payment: x402
- Status: unknown
- Last checked: 2026-09-15
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/electric-grid-reliability-interconnection-compliance-brief-0d637dfc
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_3Lpqg96TmOaODEkpx4F3E

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability electric-grid-reliability-interconnection-compliance-brief-0d637dfc
```

Example prompt: Give me a compliance digest of the electric grid reliability and interconnection rules that actually matter from the last 30 days, with any key deadlines called out.

## When to prefer this

Use this endpoint when you need a curated, human-readable summary of electric grid reliability and interconnection compliance obligations rather than raw regulatory filings. Ideal for compliance officers, energy analysts, or AI agents monitoring utility regulatory obligations who need deadlines surfaced in plain language. Prefer this over generic regulatory document search when the user wants an opinionated, LLM-filtered digest of what actually matters in the grid reliability domain.

## Known failure modes

- No regulatory changes found in the specified window — brief may be empty or minimal
- Invalid 'since' date-time format returns a 400 or schema validation error
- Payment of $0.25 USDC not completed — 402 Payment Required response
- LLM generation failure may fall back to template-based output (generatedBy: template)
- Window too large may result in timeout or truncated brief

## How this service works

LLM-written compliance digest of the electric-grid reliability & interconnection rules in the window that actually matter (reliability, interconnection, grid, nerc, transmission planning) — issuing agency named, deadlines called out.

## Output

A structured object containing: a 'brief' field with an LLM-written plain-language summary of the most material electric grid reliability and interconnection regulatory changes in the window; a 'generatedBy' field indicating whether the digest was produced by LLM or template; and a 'basedOnChanges' integer showing how many underlying regulatory changes the brief was based on.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "$schema": "https://json-schema.org/draft/2020-12/schema",
 "required": [
  "input"
 ],
 "properties": {
  "input": {
   "type": "object",
   "required": [
    "type",
    "method"
   ],
   "properties": {
    "type": {
     "type": "string",
     "const": "http"
    },
    "method": {
     "enum": [
      "GET"
     ],
     "type": "string"
    },
    "queryParams": {
     "type": "object",
     "properties": {
      "since": {
       "type": "string",
       "format": "date-time",
       "description": "Window start (default: last 30 days)"
      }
     }
    }
   },
   "additionalProperties": false
  },
  "output": {
   "type": "object",
   "required": [
    "type"
   ],
   "properties": {
    "type": {
     "type": "string"
    },
    "example": {
     "type": "object",
     "properties": {
      "brief": {
       "type": "string"
      },
      "generatedBy": {
       "enum": [
        "llm",
        "template"
       ],
       "type": "string"
      },
      "basedOnChanges": {
       "type": "integer"
      }
     }
    }
   }
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/electric-grid-reliability-interconnection-compliance-brief-0d637dfc/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from oracles-production.up.railway.app](https://www.zero.xyz/host/oracles-production.up.railway.app/llms.txt)
