# Mining Facility Energy with PUE — Single Calculation

> Mining Facility Energy with PUE — Single Calculation is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-15).

Calculates total energy consumption of a mining facility by applying a Power Usage Effectiveness (PUE) multiplier to IT equipment power draw (kWh).

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-mining-facility-energy-calculate?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-15
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/mining-facility-energy-with-pue-single-calculation-4fba36b4
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_rd8m6QZ4UPokjL8gDfyq_

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability mining-facility-energy-with-pue-single-calculation-4fba36b4 -d '<json body>'
```

Example prompt: Calculate the total energy consumption for my mining facility — the IT equipment uses 720 kWh and our PUE is 1.2.

## When to prefer this

Use this endpoint when you need a fast, single-shot computation of mining facility total energy accounting for PUE overhead, and you already have IT kWh and PUE values. Prefer this over general data center calculators when working specifically in the cryptocurrency mining context with a single bounded calculation rather than a batch or distribution run.

## Known failure modes

- pue below minimum of 1 returns validation error
- it_kwh of 0 or negative returns exclusiveMinimum violation
- it_kwh exceeding 1e16 returns maximum bounds error
- missing required fields (pue or it_kwh) returns schema validation error
- payment not provided or insufficient USDC returns 402 payment required

## How this service works

Mining facility energy with PUE — Single calculation: Single calculation for Mining facility energy with PUE. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded single calculation report.

## Output

A bounded single calculation report showing total facility energy consumption (kWh) derived by multiplying IT kWh by the PUE factor, using disclosed formulas and units. No live pricing, mining returns, or guarantees are included.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "values": {
   "type": "object",
   "default": {
    "pue": 1.2,
    "it_kwh": 720
   },
   "required": [
    "it_kwh",
    "pue"
   ],
   "properties": {
    "pue": {
     "type": "number",
     "default": 1.2,
     "maximum": 10,
     "minimum": 1
    },
    "it_kwh": {
     "type": "number",
     "default": 720,
     "maximum": 10000000000000000,
     "minimum": 0,
     "exclusiveMinimum": 0
    }
   },
   "additionalProperties": false
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/mining-facility-energy-with-pue-single-calculation-4fba36b4/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
