# Mining Facility Overhead Energy — Adjacent Period Changes

> Mining Facility Overhead Energy — Adjacent Period Changes is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-15).

Computes adjacent-period changes in total overhead energy consumption for a mining facility given IT load (kWh) and PUE values across multiple periods.

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-mining-pue-overhead-period-changes?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-15
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/mining-facility-overhead-energy-adjacent-period-changes-e6d7bcdb
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_h2WWISS8hv9e11QbVXU_j

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability mining-facility-overhead-energy-adjacent-period-changes-e6d7bcdb -d '<json body>'
```

Example prompt: For my mining facility, calculate the adjacent period changes in overhead energy using these four periods: period 1 has IT load 720 kWh and PUE 1.2, period 2 has IT load 792 kWh and PUE 1.32, period 3 has IT load 720 kWh and PUE 1.2, period 4 has IT load 792 kWh and PUE 1.32.

## When to prefer this

Choose this endpoint when you need a lightweight, cost-effective (0.01 USDC) computation of period-over-period overhead energy changes for a mining facility using only IT load and PUE inputs. It is ideal when you have a time series of up to 200 periods and want adjacent delta analysis without needing live market prices or profitability forecasts. Prefer it over general-purpose energy calculators when your domain is specifically crypto mining facility overhead with PUE-based modeling.

## Known failure modes

- Fewer than 2 rows provided — minimum 2 periods required for any adjacent comparison
- PUE value out of range (must be between 1 and 10) returns validation error
- IT kWh must be strictly greater than 0 — zero or negative values rejected
- More than 200 rows submitted exceeds maxItems limit
- Malformed row objects missing required 'it_kwh' or 'pue' fields cause schema validation failure

## How this service works

Mining facility overhead energy — Adjacent period changes: Adjacent period changes for Mining facility overhead energy. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded adjacent period changes report.

## Output

A bounded adjacent period changes report showing the computed change in overhead (total facility minus IT) energy between each consecutive pair of input periods, based on supplied IT kWh and PUE values. No live pricing, mining profitability, or return guarantees are included — only energy delta figures derived from the provided assumptions.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "rows": {
   "type": "array",
   "items": {
    "type": "object",
    "required": [
     "it_kwh",
     "pue"
    ],
    "properties": {
     "pue": {
      "type": "number",
      "default": 1.2,
      "maximum": 10,
      "minimum": 1
     },
     "it_kwh": {
      "type": "number",
      "default": 720,
      "maximum": 10000000000000000,
      "minimum": 0,
      "exclusiveMinimum": 0
     }
    },
    "additionalProperties": false
   },
   "default": [
    {
     "pue": 1.2,
     "it_kwh": 720
    },
    {
     "pue": 1.32,
     "it_kwh": 792.0000000000001
    },
    {
     "pue": 1.2,
     "it_kwh": 720
    },
    {
     "pue": 1.32,
     "it_kwh": 792.0000000000001
    }
   ],
   "maxItems": 200,
   "minItems": 2
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/mining-facility-overhead-energy-adjacent-period-changes-e6d7bcdb/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
