# Mining Power Capacity Headroom — Named Scenario Comparison

> Mining Power Capacity Headroom — Named Scenario Comparison is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-15).

Compares named what-if scenarios for mining power capacity headroom, showing how changes to capacity_kw or committed_kw affect available power headroom.

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-scenario?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-15
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/mining-power-capacity-headroom-named-scenario-comparison-13b96f4a
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_IMZZupwYVEV-D87QOOGxu

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability mining-power-capacity-headroom-named-scenario-comparison-13b96f4a -d '<json body>'
```

Example prompt: Compare my mining power headroom across two scenarios: baseline is 100 kW capacity with 70 kW committed, and the alternative scenario is 110 kW capacity — give me a named scenario comparison report showing the headroom difference.

## When to prefer this

Choose this endpoint when you need to model and compare power headroom outcomes for a mining operation across multiple named what-if configurations simultaneously, rather than computing headroom for a single scenario. Ideal for capacity planning, expansion analysis, or load-shedding decisions where named scenario labels help trace results back to business decisions. Not suitable for live price lookups, profitability forecasts, or general electrical engineering calculations outside of mining power budgeting.

## Known failure modes

- capacity_kw must be greater than 0 (exclusiveMinimum)
- committed_kw may exceed capacity_kw resulting in negative headroom (not an error but noteworthy)
- scenarios array must have at least 1 item and at most 20 items
- each scenario label must be between 1 and 80 characters
- each scenario override object must have at least 1 property
- payment of 0.01 USDC required per call; missing or failed payment returns 402
- malformed JSON body returns 400 validation error

## How this service works

Mining power capacity headroom — Named scenario comparison: Named scenario comparison for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded named scenario comparison report.

## Output

A bounded named scenario comparison report showing power capacity headroom (capacity minus committed load) for the baseline and each named scenario, including how overrides affect available headroom, calculated from supplied mining assumptions with formula and units disclosed. No live prices or guaranteed returns are included.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "baseline": {
   "type": "object",
   "default": {
    "capacity_kw": 100,
    "committed_kw": 70
   },
   "required": [
    "capacity_kw",
    "committed_kw"
   ],
   "properties": {
    "capacity_kw": {
     "type": "number",
     "default": 100,
     "maximum": 10000000000000000,
     "minimum": 0,
     "exclusiveMinimum": 0
    },
    "committed_kw": {
     "type": "number",
     "default": 70,
     "maximum": 10000000000000000,
     "minimum": 0
    }
   },
   "additionalProperties": false
  },
  "scenarios": {
   "type": "array",
   "items": {
    "type": "object",
    "required": [
     "label",
     "overrides"
    ],
    "properties": {
     "label": {
      "type": "string",
      "maxLength": 80,
      "minLength": 1
     },
     "overrides": {
      "type": "object",
      "properties": {
       "capacity_kw": {
        "type": "number",
        "default": 100,
        "maximum": 10000000000000000,
        "minimum": 0,
        "exclusiveMinimum": 0
       },
       "committed_kw": {
        "type": "number",
        "default": 70,
        "maximum": 10000000000000000,
        "minimum": 0
       }
      },
      "minProperties": 1,
      "additionalProperties": false
     }
    },
    "additionalProperties": false
   },
   "default": [
    {
     "label": "Supplied alternative",
     "overrides": {
      "capacity_kw": 110.00000000000001
     }
    }
   ],
   "maxItems": 20,
   "minItems": 1
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/mining-power-capacity-headroom-named-scenario-comparison-13b96f4a/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
