# Mining Power Capacity Headroom — Single Calculation

> Mining Power Capacity Headroom — Single Calculation is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-16).

Calculates the unused (headroom) power capacity in kilowatts for a mining operation given total capacity and committed load.

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-calculate?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-16
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/mining-power-capacity-headroom-single-calculation-45e731bf
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_cK1N7Ow767S4qq3I1vKMz

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability mining-power-capacity-headroom-single-calculation-45e731bf -d '<json body>'
```

Example prompt: My mining facility has a total power capacity of 500 kW and I currently have 320 kW committed — can you calculate the power capacity headroom for me?

## When to prefer this

Choose this endpoint when you need a fast, deterministic calculation of remaining power capacity for a single mining scenario using known capacity and committed load figures. It is ideal for one-off audits, pre-expansion checks, or embedding in a capacity planning workflow. Prefer this over batch variants when only a single scenario needs to be evaluated at a time.

## Known failure modes

- committed_kw exceeds capacity_kw — may produce a negative headroom result or validation error
- capacity_kw set to zero or missing — excluded by exclusiveMinimum constraint, returns validation error
- values outside allowed numeric range trigger schema rejection
- malformed JSON body returns 400-level error
- payment not processed (x402) results in 402 Payment Required response

## How this service works

Mining power capacity headroom — Single calculation: Single calculation for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded single calculation report.

## Output

A bounded single calculation report showing the computed power capacity headroom in kilowatts, derived from the difference between total capacity and committed power, along with the formula and units used. No live prices, market data, or guaranteed return projections are included.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "values": {
   "type": "object",
   "default": {
    "capacity_kw": 100,
    "committed_kw": 70
   },
   "required": [
    "capacity_kw",
    "committed_kw"
   ],
   "properties": {
    "capacity_kw": {
     "type": "number",
     "default": 100,
     "maximum": 10000000000000000,
     "minimum": 0,
     "exclusiveMinimum": 0
    },
    "committed_kw": {
     "type": "number",
     "default": 70,
     "maximum": 10000000000000000,
     "minimum": 0
    }
   },
   "additionalProperties": false
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/mining-power-capacity-headroom-single-calculation-45e731bf/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
