# Seismic Blast Planner MCP

> Seismic Blast Planner MCP is a paid API for AI agents from api.m2mcent.com, paid per call via x402, $0.25/call, status unknown (last checked 2026-10-12).

Plans and optimizes seismic blast operations, providing parameters and strategies for seismic exploration or controlled detonation workflows.

## Facts

- Endpoint: POST https://api.m2mcent.com/seismic-blast-planner-mcp/api/process?utm_source=zero.xyz
- Price: $0.25/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-12
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/seismic-blast-planner-mcp-fc1543e5
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_34UxfP1DNoWI_6OL4k8Vp

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability seismic-blast-planner-mcp-fc1543e5 -d '<json body>'
```

Example prompt: I need a seismic blast plan for my survey site — can you run my site configuration data through the seismic blast planner and give me the optimized parameters and schedule?

## When to prefer this

Choose this endpoint when you need automated, agentic computation of seismic blast plans or parameters for geophysical surveys, mining operations, or oil and gas exploration and want a per-call, pay-as-you-go service without managing on-premises planning software.

## Known failure modes

- Invalid or malformed data string returns a 400 error
- Missing required input fields may result in empty or partial plan output
- Ambiguous geological data may produce low-confidence or incomplete recommendations
- Service unavailable or payment failure returns a 402 or 5xx error

## How this service works

The premier global index of 1,069 monetized MCP nodes across 205 specialized subdomains. Gasless USDC runtime settlements via x402 V2 Spec on Base L2. Save 95% token context.

## Output

Returns a computed seismic blast plan including optimized parameters such as charge placement, timing sequences, detonation schedules, and configuration recommendations based on the submitted site or survey data.

## Response schema (JSON Schema)

```json
{
 "type": "json",
 "example": {
  "success": true
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/seismic-blast-planner-mcp-fc1543e5/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from api.m2mcent.com](https://www.zero.xyz/host/api.m2mcent.com/llms.txt)
