# Token Liquidity Relative Change — Ordered Trend Analysis

> Token Liquidity Relative Change — Ordered Trend Analysis is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-14).

Analyzes an ordered sequence of token liquidity observations to compute relative change trends across multiple time points.

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-token-liquidity-change-trend?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-14
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/token-liquidity-relative-change-ordered-trend-analysis-cf5b9b63
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_R1R_c2PPcubtfx9hAlxVS

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability token-liquidity-relative-change-ordered-trend-analysis-cf5b9b63 -d '<json body>'
```

Example prompt: Can you run an ordered trend analysis on these token liquidity snapshots? I have 4 observation pairs — the current and previous liquidity values are: (120000, 100000), (132000, 110000), (145000, 120000), and (160000, 132000).

## When to prefer this

Choose this endpoint when you need a deterministic, ordered trend analysis of token liquidity relative changes across multiple sequential observation pairs — particularly useful when you have a time-ordered series of current vs. previous liquidity snapshots for a DeFi token and want a structured trend verdict without running a live scan or relying on external market data feeds.

## Known failure modes

- Fewer than 2 observation rows supplied — minimum 2 required
- More than 200 observation rows supplied — maximum 200 per call
- current_liquidity or previous_liquidity is zero or negative — must be strictly positive (exclusiveMinimum: 0)
- Values exceed the maximum allowed (10^16) — rejected
- Malformed JSON body or missing required fields returns an error
- Payment not confirmed — x402 payment of 0.01 USDC required per call

## How this service works

Token liquidity relative change — Ordered trend analysis: Ordered trend analysis for Token liquidity relative change. Supplied token observations only. Deterministic calculation or caller-threshold verdict, not a live scan, safety proof or trade recommendation. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded ordered trend analysis report.

## Output

Returns a deterministic ordered trend analysis report covering the relative liquidity changes across the supplied observation pairs, including computed metrics and a trend verdict based on the sequence. Not a live scan or trade recommendation.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "rows": {
   "type": "array",
   "items": {
    "type": "object",
    "required": [
     "current_liquidity",
     "previous_liquidity"
    ],
    "properties": {
     "current_liquidity": {
      "type": "number",
      "default": 120000,
      "maximum": 10000000000000000,
      "minimum": 0,
      "exclusiveMinimum": 0
     },
     "previous_liquidity": {
      "type": "number",
      "default": 100000,
      "maximum": 10000000000000000,
      "minimum": 0,
      "exclusiveMinimum": 0
     }
    },
    "additionalProperties": false
   },
   "default": [
    {
     "current_liquidity": 120000,
     "previous_liquidity": 100000
    },
    {
     "current_liquidity": 132000,
     "previous_liquidity": 110000.00000000001
    },
    {
     "current_liquidity": 120000,
     "previous_liquidity": 100000
    },
    {
     "current_liquidity": 132000,
     "previous_liquidity": 110000.00000000001
    }
   ],
   "maxItems": 200,
   "minItems": 2
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/token-liquidity-relative-change-ordered-trend-analysis-cf5b9b63/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
