# Token Observed Price Change — Ordered Trend Analysis

> Token Observed Price Change — Ordered Trend Analysis is a paid API for AI agents from market.datapackvibe.com, paid per call via x402, $0.01/call, status unknown (last checked 2026-10-14).

Analyzes an ordered sequence of token price-change observations to identify directional trends using a deterministic algorithm.

## Facts

- Endpoint: POST https://market.datapackvibe.com/x402/assistant-bx-token-price-change-trend?utm_source=zero.xyz
- Price: $0.01/call
- Payment: x402
- Status: unknown
- Last checked: 2026-10-14
- Activations on Zero: 0
- Tags: x402
- Canonical page: https://www.zero.xyz/c/token-observed-price-change-ordered-trend-analysis-4a089b5b
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_ZNT50S_MIfOKj4BeHx1LH

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability token-observed-price-change-ordered-trend-analysis-4a089b5b -d '<json body>'
```

Example prompt: Analyze these 4 token price observations for trend direction — the pairs are: 1.0→1.2, 1.1→1.32, 1.0→1.2, 1.1→1.32. Give me the ordered trend analysis report.

## When to prefer this

Choose this endpoint when you have an ordered, caller-supplied sequence of token price observations (current vs previous pairs) and need a deterministic, reproducible trend verdict — not a live market scan or predictive model. Ideal for post-hoc analysis pipelines, audit trails, or threshold-based alerting where reproducibility matters and you control the input data.

## Known failure modes

- Fewer than 2 rows supplied — minItems constraint violated, returns validation error
- Any price value is zero or negative — exclusiveMinimum constraint violated
- More than 200 rows submitted — maxItems constraint violated
- Malformed row objects missing required current_price or previous_price fields
- Non-numeric price values passed in numeric fields

## How this service works

Token observed price change — Ordered trend analysis: Ordered trend analysis for Token observed price change. Supplied token observations only. Deterministic calculation or caller-threshold verdict, not a live scan, safety proof or trade recommendation. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded ordered trend analysis report.

## Output

A bounded ordered trend analysis report covering the submitted token price-change observation rows. Returns a deterministic verdict (not a live scan or trade recommendation) indicating the directional trend pattern across the supplied sequence of current/previous price pairs.

## Request schema (JSON Schema)

```json
{
 "type": "object",
 "properties": {
  "rows": {
   "type": "array",
   "items": {
    "type": "object",
    "required": [
     "current_price",
     "previous_price"
    ],
    "properties": {
     "current_price": {
      "type": "number",
      "default": 1.2,
      "maximum": 10000000000000000,
      "minimum": 0,
      "exclusiveMinimum": 0
     },
     "previous_price": {
      "type": "number",
      "default": 1,
      "maximum": 10000000000000000,
      "minimum": 0,
      "exclusiveMinimum": 0
     }
    },
    "additionalProperties": false
   },
   "default": [
    {
     "current_price": 1.2,
     "previous_price": 1
    },
    {
     "current_price": 1.32,
     "previous_price": 1.1
    },
    {
     "current_price": 1.2,
     "previous_price": 1
    },
    {
     "current_price": 1.32,
     "previous_price": 1.1
    }
   ],
   "maxItems": 200,
   "minItems": 2
  }
 }
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/token-observed-price-change-ordered-trend-analysis-4a089b5b/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from market.datapackvibe.com](https://www.zero.xyz/host/market.datapackvibe.com/llms.txt)
