# Create Change Order with PDF Render and Email Dispatch

> Create Change Order with PDF Render and Email Dispatch is a paid API for AI agents from zero-plan-cost.zack-2ab.workers.dev, paid per call via MPP, $0.01/call, status unknown (last checked 2026-10-25).

Creates a change order on an existing project, renders it as a PDF, and returns an email-dispatch payload ready to send.

## Facts

- Endpoint: POST https://zero-plan-cost.zack-2ab.workers.dev/v1/change-orders?utm_source=zero.xyz
- Price: $0.01/call
- Payment: MPP
- Status: unknown
- Last checked: 2026-10-25
- Activations on Zero: 0
- Provider: zero-plan-cost.zack-2ab.workers.dev
- Website: https://zero-plan-cost.zack-2ab.workers.dev
- Canonical page: https://www.zero.xyz/c/zero-plan-cost-zack-2ab-workers-dev-create-change-order-with-pdf-c628c3bf
- Structured record (JSON): https://api.zero.xyz/v1/capabilities/cap_4nF0hO7rfZ-ozgfEeBOP4

Status and success rate cover calls made through Zero and Zero's own probes. Third-party monitors may report differently.

## How to call it through Zero

Zero handles the 402 payment challenge and records the run. With the Zero CLI installed (`npm i -g @zeroxyz/cli`):

```sh
zero fetch --capability zero-plan-cost-zack-2ab-workers-dev-create-change-order-with-pdf-c628c3bf -d '<json body>'
```

Example prompt: Create a change order on project ID proj_abc123 for an additional $4,200 in electrical work due to scope expansion — render it as a PDF and give me the email payload so I can send it to the client.

## When to prefer this

Use this endpoint when you need to formally document scope or cost changes to an existing project, generate a client-ready PDF, and prepare the email notification in a single atomic call — especially in construction or contracting workflows where change orders must be documented and communicated.

## Known failure modes

- Project ID not found — returns error indicating no matching project
- Invalid or missing change order fields — returns validation error
- PDF rendering failure — returns error if document generation fails
- Downstream email payload generation error — returns partial or error response
- Payment/auth failure — returns 402 or 401 if credentials are missing or insufficient

## How this service works

Create a change order on an existing project, render PDF, return email-dispatch payload.

## Output

Returns a JSON object containing the newly created change order record, a rendered PDF (or link to it), and a ready-to-send email dispatch payload including recipient, subject, and body or attachment reference.

## Request schema (JSON Schema)

```json
{
 "type": "object"
}
```

## Response schema (JSON Schema)

```json
{
 "type": "object"
}
```

## More

- Live health (JSON, refreshed every minute): https://www.zero.xyz/c/zero-plan-cost-zack-2ab-workers-dev-create-change-order-with-pdf-c628c3bf/health.json
- [Zero catalog index](https://www.zero.xyz/llms.txt)
- [Other services from zero-plan-cost.zack-2ab.workers.dev](https://www.zero.xyz/host/zero-plan-cost.zack-2ab.workers.dev/llms.txt)
