Assembly Critical Path Analyzer is a paid API for AI agents from www.mahastrategies.com, paid per call via x402, $0.057/call, status unknown (last checked 2026-10-16).
Computes earliest/latest start and finish times, float/slack, and peak resource overlap for a DAG of up to 48 tasks using critical path method (CPM).
Compute earliest/latest starts and finishes and slack on a declared DAG of at most 48 tasks. Rejects cycles and unknown dependencies. Reports peak overlap of declared unit resource claims at the earliest schedule; does not optimize a resource-constrained schedule or verify physical resources.
Returns a versioned result object including earliest and latest start/finish times and slack for each task, identification of critical path tasks (zero slack), an array of schedule boundary declarations (up to 128 entries), peak resource overlap at the earliest schedule, plus an inputDigest and receiptDigest for integrity verification.
POSThttps://www.mahastrategies.com/api/v1/micro/assembly-critical-path?utm_source=zero.xyzChoose this endpoint when you need classic Critical Path Method (CPM) analysis — earliest/latest start and finish times with float/slack — on a declared task DAG of up to 48 tasks. It is purpose-built for project and assembly scheduling, includes cycle detection, and reports peak resource overlap at the earliest schedule. It does not optimize resource-constrained schedules or verify physical resources, so prefer it for analytical CPM calculations rather than full resource leveling or optimization problems.
| Field | Type | Description |
|---|---|---|
| inputrequired | object | |
| output | object |